VSP (Momentary Voltage Hunting and Breakout & Solution Concept)

 VSP  (Momentary Voltage Hunting and Breakout & Solution Concept)

1) Nature’s factors : Lightning strikes, mountain fire, snow storms, line faults, overgrown vegetation, flash over, animals,..

2) Artificial factors : Power line system troubles (disorder), utility networks troubles, overload operation,..

3) Normal duration time : within 0.5 sec(80~90%) 

 1sec compensation is enough

2. Power trouble influence  time & cost loss

1) Control system shut down (Unexpected)

2) Data loss

3) System rebooting

4) Abnormal errors increasing on the electronic systems

5) Transformer noise & overheat

6) Motor down & noise,….

3. Sag management in the semiconductor & display lines

1) 0.5~1.0 sec defense system

2) EMO & control line defense by the condenser backup system 

if you want to see more detail then pls visit to www.ustsemi-corp.com 
and send email to marco@ustsemi.com


Comments